Depaving Commences

Here’s a quick photo essay of the core work cycle at the depaving ceremony this morning. There were other things happening too, like a kids amusement spot with pumpkins and paint (they helped out near the end, moving small road fragments), an outfitting area and sponsored snacks. Hopefully we’ll have time to write a longer story later and give credit to the people and groups who helped with the depaving event.

The pick-axe crew at work, digging up the slabs.
Loading slabs onto the wheelbarrows. Councillor Jeff Leiper (in white) lends a hand.
Back and forth the wheelbarrow convoy goes.
Lining up to drop off asphalt squares. The front end loader lifts batches of them up into the dumpster.

One thought on “Depaving Commences

Comments are closed.